1 × Right Hull 1 × Right Hull

Items

1 × Right Hull

General Freight

5,500mm (l) x 1,200mm (w) x 2,250mm (h)

Qty 1 • 1,850 kg

Qty

1

Weight (ea)

1,850 kg

1 × Left Hull

General Freight

5,500mm (l) x 1,200mm (w) x 3,100mm (h)

Qty 1 • 1,850 kg

Qty

1

Weight (ea)

1,850 kg

1 × Central Hull

General Freight

2,300mm (l) x 1,800mm (w) x 2,250mm (h)

Qty 1 • 1,300 kg

Qty

1

Weight (ea)

1,300 kg

1 × Electrical Cabinet

General Freight

1,900mm (l) x 2,100mm (w) x 1,200mm (h)

Qty 1 • 450 kg

Qty

1

Weight (ea)

450 kg

1 × Tripod

General Freight

2,800mm (l) x 2,100mm (w) x 1,800mm (h)

Qty 1 • 850 kg

Qty

1

Weight (ea)

850 kg

1 × Pallet

General Freight

1,200mm (l) x 1,200mm (w) x 800mm (h)

Qty 1 • 250 kg

Qty

1

Weight (ea)

250 kg

1 × Pallet

General Freight

1,400mm (l) x 1,200mm (w) x 800mm (h)

Qty 1 • 200 kg

Qty

1

Weight (ea)

200 kg

26 × Poly Pipes HDPE (Bolsters Required)

Pipe • PVC • Bolsters needed • Loose

13,000mm (l) x 250mm (w) x 250mm (h)

Qty 26 • 539 kg each

Qty

26

Weight (ea)

539 kg

1 × Generator

General Freight

4,300mm (l) x 1,600mm (w) x 2,200mm (h)

Qty 1 • 3,800 kg

Qty

1

Weight (ea)

3,800 kg

8 × Concrete Blocks

General Freight

1,000mm (l) x 1,000mm (w) x 1,000mm (h)

Qty 8 • 2,400 kg each

Qty

8

Weight (ea)

2,400 kg

1 × Fuel Pod

General Freight

2,200mm (l) x 1,200mm (w) x 1,800mm (h)

Qty 1 • 700 kg

Qty

1

Weight (ea)

700 kg

3 × Pallets

General Freight

1,200mm (l) x 1,200mm (w) x 800mm (h)

Qty 3 • 100 kg each

Qty

3

Weight (ea)

100 kg

1 × Pallet

General Freight

3,000mm (l) x 1,200mm (w) x 800mm (h)

Qty 1 • 200 kg

Qty

1

Weight (ea)

200 kg

1 × Pallet

General Freight

2,500mm (l) x 2,500mm (w) x 1,200mm (h)

Qty 1 • 1,000 kg

Qty

1

Weight (ea)

1,000 kg

1 × Pump

General Freight

1,500mm (l) x 1,500mm (w) x 2,000mm (h)

Qty 1 • 800 kg

Qty

1

Weight (ea)

800 kg

1 × Slurry Hose

General Freight

2,000mm (l) x 2,000mm (w) x 600mm (h)

Qty 1 • 80 kg

Qty

1

Weight (ea)

80 kg

Total weight:

46,844 kg

Available from

13 Aug 2026

Site type

Industrial

Facilities available

Forklift

Pickup notes

LOADING FRIDAY 14TH

Deliver by

16 Aug 2026

Site type

Mine site

Facilities available

Forklift

Delivery notes

UNLOADING MONDAY 17TH

Est. 1,393.03 km

Submit your quote now and earn money moving Freight!

Download the App

Get instant load notifications straight to your phone. Stay updated, save time, and never miss a job.