loose pipe -- 2 loose pipe -- 2

Items

loose pipe

Pipe • Metal • Bolsters needed • Loose

11,600mm (l) x 250mm (w) x 250mm (h)

Qty 1 • 11,300 kg

Qty

1

Weight (ea)

11,300 kg

Total weight:

11,300 kg

Available from

13 Jul 2026

Site type

Industrial

Facilities available

Not provided

Pickup notes

MUST CONTACT YARD 48 HOURS PRIOR TO COLLECTION - Solid or reinforced headboards are to be used when transporting tubulars. AS per NTC Guideline. - Road Train Permit (Where Applicable) - A set of serviceable tubular bolsters with locking mechanism to the trailer that are suitable for the load. - Sufficient hard wood gluts to go between tubular layers. Recommended dimensions 3in x 3in x 8ft. - Adequate load restraint (chains or straps) - No load should be loaded higher than the top of the solid section of the headboard or protrude above the bolsters.

Deliver by

ASAP

Site type

Mine site

Facilities available

Telehandler

Delivery notes

Not provided

Est. 1,435.33 km

Additional Details

Fosterville Gold Mine additional contact Shaun O'toole [CONTENT REDACTED]

Submit your quote now and earn money moving Freight!

Download the App

Get instant load notifications straight to your phone. Stay updated, save time, and never miss a job.