Precast Precast

Items

Precast

General Freight

-- (l) x -- (w) x -- (h)

Qty 1

Qty

1

Weight (ea)

--

Total weight:

--

Available from

02 Aug 2026

Site type

Not provided

Facilities available

Not provided

Pickup notes

Semi or Drop Deck - carrier must have their own lashing equipment.

Deliver by

Flexible

Site type

Not provided

Facilities available

Not provided

Delivery notes

Semi or Drop Deck - carrier must have their own lashing equipment. Allowance for 2-3 hour unload time.

Est. 322.12 km

Additional Details

Our loads are between 2-4 per week over the next 6 months, 22-23ton loads on a Semi + trailer flat-deck .  Trailers need to be dropped off at our yard in Albury the day before, they will be loaded by 14:00pm.  Deliveries are usually required around 08:00 on site. Drop and swap method preferred for a more cost effective solution.

Submit your quote now and earn money moving Freight!

Premium Load

This is a Premium load managed by the Loadshift team.

Payment will be processed through our secure payment system, ensuring you are paid on delivery.

Download the App

Get instant load notifications straight to your phone. Stay updated, save time, and never miss a job.